Selected references

Projects that make energy tangible

A selection of realised wind and photovoltaic projects. Each record includes its source and data date.

Project overview

Technology
Status

Wind turbines at the Hamwiede project
Wind energyRealised

Windpark Hamwiede

Hamwiede, Niedersachsen

Seven wind turbines with a combined capacity of 16.80 MW.

The project, realised in 2015, comprises seven Nordex N117 turbines.

  • 16,80 MW
  • 7 turbines
  • 2015
Source & data date

PLAN 8 GmbH Referenzliste 07/2026 und Altwebsite
2026-07

Wind turbines near Parstein
Wind energyRealised

Windpark Parstein I

Lüdersdorf, Brandenburg

Three Enercon E-82 turbines.

The wind farm was realised in 2014 with three turbines and 6.90 MW total capacity.

  • 6,90 MW
  • 3 turbines
  • 2014
Source & data date

PLAN 8 GmbH Referenzliste 07/2026 und Altwebsite
2026-07

Repowered wind turbines at Schülp
Wind energyRealised

Windpark Schülp Repowering

Schülp, Schleswig-Holstein

Four turbines in a repowering project at a historic PLAN 8 site.

The repowering project, realised in 2014, comprises four Enercon E-70 turbines totalling 9.20 MW.

  • 9,20 MW
  • 4 turbines
  • 2014
Source & data date

PLAN 8 GmbH Referenzliste 07/2026 und Altwebsite
2026-07

Ribnitz-Damgarten ground-mounted solar plant
PhotovoltaicsRealised

Ribnitz-Damgarten I

Ahrenshagen-Daskow, Mecklenburg-Vorpommern

Ground-mounted photovoltaic plant with 2.55 MWp.

The ground-mounted plant in Ahrenshagen-Daskow was realised in 2013 with 2.55 MWp.

  • 2,55 MWp
  • 2013
Source & data date

PLAN 8 GmbH PV-Referenzliste 02/2023 und Altwebsite
2023-02

Barby solar plant
PhotovoltaicsRealised

Freifläche Barby

Barby, Sachsen-Anhalt

Ground-mounted photovoltaic plant with 1.30 MWp.

The photovoltaic plant in Barby was realised in 2011 with 1.30 MWp.

  • 1,30 MWp
  • 2011
Source & data date

PLAN 8 GmbH PV-Referenzliste 02/2023 und Altwebsite
2023-02

Each card shows its data date and source. Complete reference lists are available in the download area.